⚙️Calculation Parameters

inches
inches
%
Bag Yield Standard:ASTM C387 (0.60 ft³/80lb)

📊Calculated Output

Cubic Yards (yd³)
0.36
Ready-mix truck volume
Cubic Feet (ft³)
9.60
Total wet concrete volume
80 lb Premix Bags
16
@ 0.60 cu.ft per bag
60 lb Premix Bags
22
@ 0.45 cu.ft per bag
Metric Volume:0.272 m³ (272 L)
Estimated Concrete Weight:~1,392 lbs (631 kg)
Mixing Water Required:~12.0 gal (~45 L)
Per Tube Volume:2.18 ft³ (0.081 yd³)

How Sonotube Fill Percentage Calculator Works?

To get a fill percentage, the Sonotube Fill Percentage Calculator divides the placed volume by the full tube capacity. The process takes 4 steps.

  1. Enter the tube size

    Type the diameter and full length. The calculator finds the full capacity.

  2. Enter placed concrete

    Type the fill height, the bags placed or the cubic feet (ft³) placed.

  3. Divide by capacity

    The calculator divides placed volume by capacity and multiplies by 100.

  4. Read progress

    The tool shows the percent full, the volume left and a progress bar.

Sonotube Fill Percentage Calculator Formula

The Sonotube Fill Percentage Calculator compares 2 volumes.

Capacity

C = π × (D ÷ 24)² × (L ÷ 12)

Full volume of the tube.

Fill percentage

P = V_placed ÷ C × 100%

Same result as fill height ÷ length.

Volume left

V_left = C × (1 − P ÷ 100)

Volume to finish.

Worked example: 16 in × 60 in tube, 10 bags of 80 lb placed

  1. C = 6.981 ft³
  2. V_placed = 10 × 0.60 = 6.00 ft³
  3. P = 6.00 ÷ 6.981 = 85.9% full, with 0.98 ft³ left

Sonotube Fill Percentage Calculator Conversion Table

The fill percentage conversion table shows progress in one 16 in × 60 in (41 cm × 152 cm) tube as the concrete rises.

Fill percentage of a 16 in × 60 in tube
Fill heightPlaced ft³Placed LPercent fullft³ left
12 in1.404020%5.59
24 in2.797940%4.19
30 in3.499950%3.49
36 in4.1911960%2.79
48 in5.5915880%1.40
60 in6.98198100%0.00

In a straight tube the percent full equals fill height divided by length.

What is Sonotube Fill Percentage Calculator?

A Sonotube Fill Percentage Calculator is a progress tool that reports how full a round concrete form is as a percentage of its capacity.

A percentage gives a fast read on large tubes, where the top is hard to see and a flashlight check takes time. Ten bags in a 16 in × 60 in tube put the pour at 86%. The crew knows 2 more bags finish the job.

The tool works for single tubes and for whole projects, where it divides total placed volume by total capacity.

What are the uses of Sonotube Fill Percentage Calculator?

There are 4 main uses of the Sonotube Fill Percentage Calculator.

  • Pour monitoring

    Supervisors track progress during long column pours.

  • Truck chute timing

    Drivers slow the chute near 90% to avoid overflow.

  • Daily reports

    Site leads log percent complete for each pier.

  • Batch counting

    Mixer crews see how many batches remain.