⚙️Calculation Parameters

inches
inches
%
Bag Yield Standard:ASTM C387 (0.60 ft³/80lb)

📊Calculated Output

Cubic Yards (yd³)
0.36
Ready-mix truck volume
Cubic Feet (ft³)
9.60
Total wet concrete volume
80 lb Premix Bags
16
@ 0.60 cu.ft per bag
60 lb Premix Bags
22
@ 0.45 cu.ft per bag
Metric Volume:0.272 m³ (272 L)
Estimated Concrete Weight:~1,392 lbs (631 kg)
Mixing Water Required:~12.0 gal (~45 L)
Per Tube Volume:2.18 ft³ (0.081 yd³)

How Gravel Base Volume Calculator Works?

To size a gravel base, the Gravel Base Volume Calculator finds the cylinder of stone at the bottom of each hole, using the hole width and gravel depth. The process takes 4 steps.

  1. Enter the hole diameter

    Type the dug hole width, which is usually 4 in to 6 in (10 cm to 15 cm) wider than the tube.

  2. Enter gravel depth

    Type the compacted stone depth, commonly 4 in to 6 in.

  3. Enter the hole count

    Type the number of holes.

  4. Read gravel quantities

    The calculator shows cubic feet (ft³), cubic yards (yd³), tons and 0.5 ft³ bags of crushed stone.

Gravel Base Volume Calculator Formula

The Gravel Base Volume Calculator applies the cylinder formula to the hole bottom.

Gravel volume

V = n × π × (D_hole ÷ 24)² × (t ÷ 12)

D_hole and t in inches.

Gravel weight

W ≈ V × 100 lb/ft³

Crushed stone weighs about 95 to 110 lb/ft³ (1,520 to 1,760 kg/m³).

Tons

Tons = W ÷ 2,000

US short tons.

Worked example: 10 holes, 20 in wide, 6 in of gravel

  1. V = 10 × 3.1416 × (20 ÷ 24)² × 0.5 = 10.91 ft³
  2. 10.91 ft³ = 0.404 yd³
  3. Weight ≈ 1,091 lb (0.55 tons), or 22 bags of 0.5 ft³ stone

Gravel Base Volume Calculator Conversion Table

The gravel base conversion table lists the stone needed per hole and for 10 holes at 6 hole sizes.

Gravel base volumes
HoleGravel depthft³ per holeft³ for 10 holesyd³ for 10 holesTons for 10 holes
16 in hole4 in0.4654.650.1720.23
18 in hole4 in0.5895.890.2180.29
20 in hole6 in1.09110.910.4040.55
24 in hole4 in1.04710.470.3880.52
24 in hole6 in1.57115.710.5820.79
30 in hole6 in2.45424.540.9091.23

Weight uses 100 lb/ft³. Use 3/4 in (19 mm) crushed stone for drainage.

What is Gravel Base Volume Calculator?

A Gravel Base Volume Calculator is a material calculator that estimates the crushed stone placed under each Sonotube to drain water and level the base.

Water that pools under a pier freezes and lifts it. A layer of compacted crushed stone gives water a path out and gives the tube a flat, firm seat. The stone fills the full hole width, not the tube width, so the calculator uses the hole diameter.

Ten 20 in holes with 6 in of stone need 10.9 ft³ of gravel, or about 0.55 tons.

What are the uses of Gravel Base Volume Calculator?

There are 4 main uses of the Gravel Base Volume Calculator.

  • Drainage beds

    Builders place stone under every pier for drainage.

  • Bulk stone orders

    Contractors order gravel by the ton or yard.

  • Bagged stone

    Owners count 0.5 ft³ bags for small jobs.

  • Leveling

    Crews set tube bottoms at an even elevation.